WorkspaceConstruction Sequencing Simulator

Construction Sequencing Simulator

Link BIM elements to timed installation and removal work, simulate changing site geometry and resolve prerequisite, access and workspace conflicts.

Application guide

Verifying your session…

Using Construction Sequencing Simulator

Simulate timed installation and removal of linked building elements and identify planning conflicts.

Model-linked installation schedule · Spatial approach and time conflicts · Baseline finish variance

Inputs and working data
Original hash-verified BIM revision, initially installed elements, scheduled activity attachments, predecessor edges, access direction, reach, clearance and frozen baselines.
Working in the editor
BIM source/revision selector, initial state assignment, activity controls, playback/scrubbing, conflict review and baseline tracking.
What can I produce?
Timed model plan, exception intervals, baseline finish variance and installation register with original source geometry in ZIP.
What are the limits?
240 activities, 20 baselines, one install and one removal per element. Operation envelopes use supplied orthogonal approach and clearances.
Example
Install under a cover, overlap a dependent task, inspect timed model states, reschedule versus a baseline, export and reopen.
Back to the editor