Dredging Campaign Planning
Reconcile surveyed excavation quantities and completed loads with material-specific excavation, haul cycles and receiving-site capacity.
Application guideVerifying your session…
Using Dredging Campaign Planning
Reconcile surveyed excavation quantities and completed loads with material-specific excavation, haul cycles and receiving-site capacity.
Survey excavation quantities · Material and disposal eligibility · Hopper productivity · Monitored progress
- Inputs and working data
- Excavation areas CSV, Receiving sites CSV, Measured load tickets CSV, Planned campaign shifts CSV. Material bulking relates bank and loose volumes.
- Working in the editor
- Excavation and haul assumptions with editable input layers, saved comparisons, graphical and tabular results.
- What can I produce?
- Ticket progress, achievable voyages, remaining cuts and site capacity.
- What are the limits?
- One hopper per shift in supplied sequence and lumped cycle time. Historical overages are retained.
- Example
- Harbor sediment removal campaign. Two excavations use different material placement sites and measured progress.