WorkspaceDredging Campaign Planning

Dredging Campaign Planning

Reconcile surveyed excavation quantities and completed loads with material-specific excavation, haul cycles and receiving-site capacity.

Application guide

Verifying your session…

Using Dredging Campaign Planning

Reconcile surveyed excavation quantities and completed loads with material-specific excavation, haul cycles and receiving-site capacity.

Survey excavation quantities · Material and disposal eligibility · Hopper productivity · Monitored progress

Inputs and working data
Excavation areas CSV, Receiving sites CSV, Measured load tickets CSV, Planned campaign shifts CSV. Material bulking relates bank and loose volumes.
Working in the editor
Excavation and haul assumptions with editable input layers, saved comparisons, graphical and tabular results.
What can I produce?
Ticket progress, achievable voyages, remaining cuts and site capacity.
What are the limits?
One hopper per shift in supplied sequence and lumped cycle time. Historical overages are retained.
Example
Harbor sediment removal campaign. Two excavations use different material placement sites and measured progress.