Lockout Isolation Planner
Trace energy paths on supplied site maps and record point verification, personal holds and authorized restoration.
Application guideVerifying your session…
Using Lockout Isolation Planner
Review the supplied energy-source map for target equipment and coordinate documented field application, verification, personal holds and authorized restoration.
Source connectivity · Independent verification · Personal hold records · Restoration dependencies
- Inputs and working data
- Directed source/junction/equipment topology and control gates, supplied procedure references, nominated site roles, original instruction, point records, personal holds and restoration dependencies.
- Working in the editor
- Source topology editor, site control points, proposed boundary, independent review, personal holds and restoration signoff.
- What can I produce?
- Mapped reachability paths, point status, personal lock ownership, restoration record and ZIP of site instruction and signed history.
- What are the limits?
- 200 topology nodes and points, 600 directed path segments. Coverage reflects user-supplied topology; application and restoration instructions come from the site.
- Example
- Import a site boundary, approve its supplied original, record and verify a point under separate accounts, register/release an individual hold, authorize restoration and close.