Product Lifecycle Management
Release independently reviewed engineering changes, resolve product configurations and hand over pinned manufacturing baselines.
Application guideVerifying your session…
Using Product Lifecycle Management
Control original part drawings, engineering change orders, released product configurations and manufacturing receipt of a pinned bill of materials.
Released part revisions · Configurable BOM · Change approvals · Manufacturing handover
- Inputs and working data
- Program features and build configurations, original revision drawings, named engineering change orders, pinned BOM lines, decisions and signed manufacturing handover snapshots.
- Working in the editor
- Program options, original drawing intake, change review, revision explorer and manufacturing handover/acknowledgment.
- What can I produce?
- Configuration tree, transitive where-used impact, purchased quantities, as-built structure, original drawings, change decisions and manufacturing receipt ZIP.
- What are the limits?
- 100 lines per assembly, 100 configurations, bounded depth and 10000 expanded occurrences, 48 KB per original drawing.
- Example
- Release a purchased clip and configured assembly under separate reviewer accounts, issue a pinned three-clip manufacturing BOM, acknowledge it and reopen the handover.