Construction Site Logistics
Design temporary roads and exclusion or storage zones, route phased deliveries and inspect moving vehicle conflicts and stock occupancy.
Application guideVerifying your session…
Using Construction Site Logistics
Plan civil construction logistics across phased access, movement and storage constraints.
Temporary roads and work exclusions · Timed vehicle envelopes · Storage capacity by phase
- Inputs and working data
- Named site phases, metric node coordinates, directed temporary roads and access limits, exclusion rectangles, storage bays and timed deliveries.
- Working in the editor
- Phase, node, road, zone and delivery editors with movement map, conflict ledger and stock capacity review.
- What can I produce?
- Scrubbable phase map, routed and blocked deliveries, time and location of movement conflicts, peak storage and logistics ZIP.
- What are the limits?
- 30 phases, 150 nodes, 350 roads, 160 zones and 180 deliveries. Straight site roads, circular movement envelopes defined by width, fixed travel speeds and planned unload times.
- Example
- Route delivery vehicles, detect a shared movement and stock overflow, close the road with an exclusion, export and reopen.